Samedi 27 OFF 2
Samedi 27 OFF 2
Compatible accessories
Compatible accessories
Features that will make you smile
Frame
Frame
Off 2 low step-over, 6061 T4-T6 alloy, triple cavity hydroformed and extruded tubes of variable thickness for optimal stiffness, Exclusive integration for the Bosch PowerTube (vertical) battery, internal cable routing
Suspensions
Fork
SR Suntour, XCM ATB, preload adjustment, 100mm travel
Motor system
Motor
Bosch, Performance Line BDU33, Smart System, 75Nm
Battery
Bosch, PowerTube 500Wh, vertical, Smart System
Display
Bosch, Intuvia 100, Smart System
Remote
Bosch, LED remote Bluetooth
Autonomy
98km
Charger
Bosch, 4Ah
Transmission
Rear Derailleur
Shimano, Deore, RD-M5120-SGS, 10-11-speed
Chainring
Narrow-Wide, 38 teeth, chainguard
Cassette
Sunrace, CSMS8, 11-speed, 11-46T
Chain
Sram, PC1110, 11-speed, 120 links
Shifter
Shimano, Deore, SL-M5100-R, 11-speed
Cranks
Moustache, aluminium, 170mm moteur Gen3
Brakes
Front brake
Shimano, MT200 or Alhonga HJ-472, hydraulic disc brake
Rear Brake
Shimano, MT200 or Alhonga HJ-472, hydraulic disc brake
Front Rotor
Shimano, 180mm or Alhonga, 180mm
Rear Rotor
Shimano, 180mm or Alhonga, 180mm
Wheels
Front Hub
Shimano, 32H, 9x100mm, QR (Quick Release)
Rear Hub
Shimano, 32H, 9x135mm, QR (Quick Release)
Front rim
Moustache, asymmetric, alloy 6061E, welded, 32 holes, 27.5'', internal width 23mm
Rear rim
Moustache, asymmetric, alloy 6061E, welded, 32 holes, 27.5'', internal width 23mm
Front tyre
Maxxis, Forekaster, 27.5x2.35
Cockpit
Handlebar
Moustache, alloy, 680mm, 15mm rise, 9° backsweep, 5° upsweep
Stem
Moustache, 3D forged Aluminum, 70mm
Headset
FSA, No 57B-1
Grips
Ergonomic, dual-density
Saddle
Moustache, Comfort
Seatpost
Suspension, alloy, 31.6mm, 350mm, 40mm travel
Seatclamp
Moustache, alloy, 34.9mm
Equipment
Pedals
Resin platform with reflectors
Features
Size
M
Color
Metalic red glossy
Weight
23.8kg
GVWR
135kg
Warranty
Warranty
5 years frame and fork Moustache Bikes - 2 years motor, battery
Product specifications may change without notice. Non-binding information.
Other models
Compare-
Color(s)
-
Motor / Battery
Bosch Active Line Plus / PowerPack 400Wh
-
Display
Purion
-
Autonomy
97 km*
-
Fork
Suntour XCM 80mm
-
Transmission
Shimano 9-speed
-
Color(s)
-
Motor / Battery
Bosch Performance Line / PowerTube 500Wh / Smart System
-
Display
Intuvia 100 / LED Remote / Smart System
-
Autonomy
97 km*
-
Fork
Suntour XCM ATB 100mm
-
Transmission
Shimano Deore 11-speed
-
Color(s)
-
Motor / Battery
Bosch Performance Line CX / PowerTube 625Wh / Smart System
-
Display
Purion 200
-
Autonomy
108 km*
-
Fork
SR Suntour XCR 34 120mm
-
Transmission
Shimano CUES 11-speed
-
Color(s)
-
Motor / Torque
Bosch Performance Line CX Smart System / 85–100 Nm
-
Battery / Range
Bosch PowerTube 600 Wh / up to 152 km
-
Display
Bosch Purion 200
-
Drivetrain
Shimano CUES – 11-speed
Adjusting the SAG of the shock absorber is the first and most essential adjustment to make on an MTB! It’s also one of the easiest measurements to get wrong… so here’s how to do it:
If you’re alone, set up near a wall (it’ll help you balance at the start and end). Ideally, though, it’s best to have two people for this operation.
Of course, you need to be fully equipped, just as if you were heading out for a ride, so the total weight reflects real riding conditions.
-
Inflate the shock absorber to the base pressure corresponding to your weight. With Moustache bikes, it’s simple: it’s approximately your weight multiplied by 2 (to get the equivalent in PSI). So, if you weigh 75 kg × 2 = 150 PSI. Easy ;-{D. Make sure the shock is in the open position when measuring SAG!
-
Get on your bike, with the saddle lowered (if you have a dropper post). Either hold onto the wall or have someone assist you. At this point, you’ve put much more pressure on the suspension than just your body weight. Sit down on the saddle and then raise it to your usual pedaling position.
-
Release the brakes, which might lock the suspension, and gently bounce the handlebars to ensure the suspension settles correctly into the SAG position for your weight.
Now comes the tricky part, where your balancing skills will shine!
-
If you have someone to assist you, they can simply check where the SAG indicator ring aligns with the measurement marker on the frame. Done!
-
If you’re alone, carefully slide the indicator ring up against the shock body without making the suspension move, then carefully dismount using the wall for support (without applying any extra pressure, as this could distort the measurement). Not easy, we know… but it’s doable!
Once off the bike, and if you’re confident the measurement wasn’t altered, check where the ring aligns with the SAG marker.
-
If there’s less SAG than recommended, release some air with the pump.
-
If there’s too much SAG, add more air.
You’ll find adjustment tips in your Moustache user manual.
































































