Samedi 27 OFF 2 2023

The Samedi 27 OFF is there for you! To accompany you on your most ambitious rides and to push you on the climbs! Its Bosch Performance motor offers support that's so natural, that its 75Nm will give you the impression you have wings! You can count on its agility and the precision of its aluminum triple cavity frame to choose the best line. And if you are aspiring to climb trees, you can count on the Shimano Deore 11-speed wide-range transmission ;-{D

Characteristics

Accessories

Specifications

Choose your frame

Choose your battery

Choose your size

Standard frame: S (1,55 -1,70m) M (1,68 - 1,83m) L (1,80 - 1,95m) XL (1,90 - 2,05m) Open frame: S (1,49 -1,61m) ; M (1,59 - 1,76m) ; L (1,74 - 1,90m)

Save my configuration

Receive your configuration by email or create an account to save it to your account.

Sent!

Features that put a smile on your face

Accessories and equipment

Specifications

Your configuration

Reference

SA27CO253230

Frame

Frame

Off 2, 6061 T4-T6 alloy, triple cavity hydroformed tubes of variable thickness, Exclusive integration for the Bosch PowerTube (vertical) battery, internal cable routing

Suspensions

Fork

SR Suntour, XCM ATB, preload adjustment, 100mm travel

Motor system

Motor

Bosch, Performance Line BDU33, Smart System, 75Nm

Battery

Bosch, PowerTube 500Wh, vertical, Smart System

Display

Bosch, Intuvia 100, Smart System

Remote

Bosch, LED remote Bluetooth

Conditions

Maximum distance, calculated for a 70kg rider in ideal conditions. Estimate your battery range .

Charger

Bosch, 4Ah

BCM

Not equipped with Bosch ConnectModule

range autonomy

98 km

Transmission

Rear Derailleur

Shimano, Deore, RD-M5120-SGS, 10-11-speed

Chainring

Narrow-Wide, 38 teeth, chainguard

Cassette

Sunrace, CSMS8, 11-speed, 11-46T

Chain

Sram, PC1110, 11-speed, 120 links

Shifter

Shimano, Deore, SL-M5100-R, 11-speed

Cranks

Moustache, aluminium, 170mm moteur Gen3

Brakes

Front brake

Shimano, MT200 or Alhonga HJ-472, hydraulic disc brake

Rear Brake

Shimano, MT200 or Alhonga HJ-472, hydraulic disc brake

Front Rotor

Shimano, 180mm or Alhonga, 180mm

Rear Rotor

Shimano, 180mm or Alhonga, 180mm

Wheels

Front Hub

Shimano, 32H, 9x100mm, QR (Quick Release)

Rear Hub

Shimano, 32H, 9x135mm, QR (Quick Release)

Front rim

Moustache, asymmetric, alloy 6061E, welded, 32 holes, 27.5'', internal width 23mm

Rear rim

Moustache, asymmetric, alloy 6061E, welded, 32 holes, 27.5'', internal width 23mm

Wheels

Maxxis, Forekaster, 27.5x2.35

Front tyre

Maxxis, Forekaster, 27.5x2.35

Rear tyre

Maxxis, Forekaster, 27.5x2.35

Cockpit

Handlebar

Moustache, alloy, 680mm, 15mm rise, 9° backsweep, 5° upsweep

Stem

Moustache, 3D forged Aluminum, 70mm

Headset

FSA, No 57B-1

Grips

Ergonomic, dual-density

Saddle

Moustache, Comfort

Seatpost

Suspension, alloy, 31.6mm, 350mm, 40mm travel

Seatclamp

Moustache, alloy, 34.9mm

Equipment

Front light

-

Pedals

Resin platform with reflectors

Features

Size

L

Color

Metalic red glossy

Weight

24.1 kg

GVWR

135 kg

Warranty

Warranty

5 years frame and fork Moustache Bikes - 2 years motor, battery

Product specifications may change without notice. Non-contractual information.

Geometry

Documents to download

Advice on the range

How to choose your size?

For an optimal cycling experience, choosing the right size is the first step. Rest assured! At Moustache, we understand the importance of comfort when cycling. That's why, to meet the needs of every body type, our models are available in 4 different sizes: S, M, L, and XL.

On each product page, in the “geometry” section, you will find Moustache's recommended sizes for the specific model. This information helps you make an informed decision based on your body type and riding preferences.

What if I'm between two sizes?

If you find yourself between two sizes and have doubts, the first thing that will guide you towards one model or the other will be your inseam and your preferences. To be sure of your choice, do not hesitate to contact an authorized Moustache dealer.

Our partners are trained to offer you personalized advice based on your size, bike configuration, and individual preferences!

What is a bicycle's GVWR and why is it important?

The GVWR (Gross Vehicle Weight Rating) corresponds to the maximum weight your bike can support, including the rider and luggage. This value is essential because it guarantees your safety on the road while preserving performance, proper functioning, and the longevity of the components.

At Moustache, we design each model with a specific, rigorously tested GVWR. Exceeding this limit can lead to premature wear, malfunctions, or unstable bike behavior. For this reason, any damage resulting from non-compliance with the GVWR may not be covered by the warranty.

To find this information for a specific bike:

1. Open the "Specifications" tab for the bike you are interested in.

2. Scroll down to the "Features" section: you will find the GVWR and the associated weight there.

How are Moustache bikes made?

Since our brand launched in 2011, all our Moustache bikes have been designed, drawn, tested, and assembled in-house here in the Vosges. And it's not just a marketing claim; our bikes are created by cyclists for cyclists of all profiles, and that's immediately felt when you ride our bikes.

However, not all parts and components that make up our bikes are produced in our factory, and we must rely on specialized suppliers for the various components. This is notably the case for our hydroformed aluminum frames, the centerpiece of our bikes whose quality is essential, which have been manufactured for us in Taiwan by our historical partner for 10 years.

We thus receive our frames and the various components from our suppliers (such as Bosch motors from Germany, Brooks saddles from England, Supernova lights from Germany, etc.) in the Vosges, and then the final assembly of each bike is carried out by a single assembler here. Each year, we train new employees on our production lines and have already created dozens of jobs in a few years, which is one of our greatest prides.

We aspire to bring even more activity and added value locally to our factory in Thaon-Les-Vosges, which is why we are developing new specific production lines for the manufacture of parts such as wheels, for example.

Which Moustache electric bike model to choose?

For an in-depth and detailed search, we believe that nothing beats personalized advice and a listening ear when looking for the bike of your dreams. We recommend visiting one of our authorized Moustache dealers in store, who will best guide you through the different bikes in our range.

And who knows, you might even be able to test ride one of the available bikes to make up your own mind ;-{D

To do this, simply enter here your city to locate the nearest authorized dealers.

What are the advantages of the digital ownership certificate?

Are you wondering how to protect your precious bike and ensure its traceability throughout its life? The digital ownership certificate is the ideal solution for you! Registered on a blockchain, this unique certificate allows you to track the complete history of your bike, including transfers of ownership.

Why activate the digital ownership certificate?

Extend my warranty to 10 years: Enjoy unparalleled peace of mind with a 10-year warranty on the frame. Imagine riding worry-free, knowing your frame is protected for an entire decade!

Increase the chances of recovery in case of theft or loss: A lost or stolen bike can be quickly returned thanks to the QR code on the Moustache Code tag, which allows anyone to send you an anonymous message to help you recover your bike.

How to activate your digital ownership certificate?

In France:

Your store will register your bike on the national file. Then, your bike will automatically appear in your virtual garage as soon as you log in. Please note, for this to work, you must log in at least once using the same email address provided to the store during registration.

Abroad:

The buyer must perform this operation. Two options are available to you:

  • Scan the QR code.
  • Enter the Moustache Code number in your space to add the bike to the virtual garage.

What to do if I resell my bike?

Change my bike's status to “For Sale”:

You can easily put your bike up for sale from your account and thus prove that you are indeed the owner. This feature allows peer-to-peer transactions with complete confidence and helps maintain the value of Moustache bikes in the second-hand market ;-D

How to transfer ownership of your bike?

Transferring ownership to the buyer is child's play! Log in to your virtual garage, click on “transfer ownership” and the buyer will receive an email request. Once accepted, the bike will be automatically transferred.

With the digital ownership certificate, you invest in the security of your bike. Enjoy an extended warranty, a better chance of recovery in case of theft, and easy transfer of ownership. So, protect your bike with this innovative certificate! ?✨

What are Moustache's warranty conditions?

The warranty is limited to 5 years for the frame and 2 years for the bicycle components as well as the Bosch motor system, effective from the date of purchase.

For any warranty claim, please visit your authorized Moustache dealer with your purchase invoice. The dealer will perform an initial diagnosis and contact us if necessary. Normal wear and tear of certain parts (known as wear parts) is not covered by the warranty.

List of different wear parts:

  • Braking elements (pads, discs).
  • Tires, inner tubes, rim tapes.
  • Cables and housing.
  • Drivetrain components (chain, chainring, cassette, derailleur pulleys, chain guide).
  • Headset bearing.
  • Grips

Find your
authorised retailer

More than 600 specialist retailers across France and around the world. Our experts help you choose your bike and provide after-sales service.

600+

retailers
worldwide

Fermer

Select your location

Europe
Oceania
North America